Ekspedycje > IGAU Inverness Survey Expedition
Czas rozpoczęcia | 15 cze 2020, 12:00:00 |
Czas przybycia | 27 sie 2020, 18:30:00 |
Układ początkowy | Froarks PJ-X b19-6 |
Punkty kontrolne | 7 |
Układ docelowy | Colonia (Jaques Station / Colonia (System) / Animula Spires / The Mosta-Murdoch Raceway) |
Uczestnicy | 12 |
- Abandonment | 3 |
- Success | 9 |
Szacunkowa długość | 36 073,64 ly |
Welcome to the IGAU Inverness Nebula Survey!
The IGAU Inverness carrier (X8V-6KZ) is on a voyage surveying various nebulae around and in the galactic core, spending at least one week at each waypoint. The expedition will end with the carrier returning to inhabited space (Colonia) sometime in the Fall (Q3 2020).
Expedition chat is on the IGAU Discord server, #inverness channel, or FleetComm, #igau-inverness channel. More information can be found in the forum thread.
Services available on the carrier: Universal Cartographics, Shipyard, Repair, Refuel, Armoury. Tariff rate is 0%.
Note: the total distance covered will be much longer than the listed 10,500 ly, as we'll circle the core, counter-clockwise.
Ta ekspedycja już się zakończyła.
Układ | Dystans od początku | Osiągnięty przez uczestników | Uczestnicy odwiedzili | |||
---|---|---|---|---|---|---|
#1 | Froarks PJ-X b19-6 |
|
|
|||
#2 | Greae Phio DT-G d11-1970 | 2 890,72 ly |
|
|
||
#3 | Dryi Aoc CH-C d13-3379 | 6 293,49 ly |
|
|
||
#4 | Shrogaae LB-C c14-361 | 8 958,58 ly |
|
|
||
#5 | Scheau Prao XF-E d12-4452 | 14 370,49 ly |
|
|
||
#6 | Phipoea WK-E d12-1374 (Crown Of Ice) | 18 190,63 ly |
|
|
||
#7 | Dryio Bloo LT-Y d1-1376 | 24 418,92 ly |
|
|
||
#8 | Stuemiae EO-W b58-58 | 28 683,59 ly |
|
|
||
#9 | Colonia (Jaques Station / Colonia (System) / Animula Spires / The Mosta-Murdoch Raceway) | 36 073,64 ly |
|
|