Elvira Martuuk
Lokace: Khun / Long Sight BaseSpecializace: Frame shift drives, Shield generators
Locked
This blueprint speeds up boot up times and gives a small range increase, at the cost of module integrity and power draw.
- Optimal Mass
- +15%
- Integrity
- -15%
- Boot Time
- -80%
- Thermal Load
- +20%
Mikro surovina. | Cena |
---|---|
Electrochemical Arrays
|
1 |
Heat Vanes
|
1 |
Tellurium
|
1 |
Experimentální efekty