Muang [#4481966019282]
Poslední aktualizace: 28.01.21 4:01
Optional Internal |
---|
FSD Interdictors | Integrity | Mass | Power | Price | ||
---|---|---|---|---|---|---|
1E | Frame Shift Drive Interdictor | Used to pull targets out of supercruise. | 32 | 1,3 t | 0,14 MW | 12 000 CR |
1D | Frame Shift Drive Interdictor | Used to pull targets out of supercruise. | 24 | 0,5 t | 0,18 MW | 36 000 CR |
2D | Frame Shift Drive Interdictor | Used to pull targets out of supercruise. | 31 | 1 t | 0,22 MW | 100 800 CR |
2C | Frame Shift Drive Interdictor | Used to pull targets out of supercruise. | 51 | 2,5 t | 0,28 MW | 302 400 CR |
3D | Frame Shift Drive Interdictor | Used to pull targets out of supercruise. | 38 | 2 t | 0,27 MW | 282 240 CR |
3C | Frame Shift Drive Interdictor | Used to pull targets out of supercruise. | 64 | 5 t | 0,34 MW | 846 720 CR |
4E | Frame Shift Drive Interdictor | Used to pull targets out of supercruise. | ?? | 10 t | 0,25 MW | 263 420 CR |
4D | Frame Shift Drive Interdictor | Used to pull targets out of supercruise. | 48 | 4 t | 0,33 MW | 790 270 CR |
Utility Mount |
---|
Kill Warrant Scanners | Integrity | Mass | Power | Price | ||
---|---|---|---|---|---|---|
0E | Kill Warrant Scanner | Scanner that incorporates real-time communication with multiple law enforcement networks to obtain all issued bounties. | 32 | 1,3 t | 0,2 MW | 13 540 CR |
0D | Kill Warrant Scanner | Scanner that incorporates real-time communication with multiple law enforcement networks to obtain all issued bounties. | 24 | 1,3 t | 0,4 MW | 40 630 CR |
Manifest Scanners | Integrity | Mass | Power | Price | ||
---|---|---|---|---|---|---|
0E | Cargo Scanner | Scanner that can detect and analyse the contents of a targeted vessel's cargo hold and passenger cabins. | 32 | 1,3 t | 0,2 MW | 135 400 CR |
0D | Cargo Scanner | Scanner that can detect and analyse the contents of a targeted vessel's cargo hold and passenger cabins. | 24 | 1,3 t | 0,4 MW | 40 630 CR |
Wake Scanners | Integrity | Mass | Power | Price | ||
---|---|---|---|---|---|---|
0E | Frame Shift Wake Scanner | Scanner that can calculate the destination of a hyperspace jump by analysis of frame shift energy wake. | 32 | 1,3 t | 0,2 MW | 13 540 CR |
0D | Frame Shift Wake Scanner | Scanner that can calculate the destination of a hyperspace jump by analysis of frame shift energy wake. | 24 | 1,3 t | 0,4 MW | 40 630 CR |