Chraichio OO-X d2-0 [#15141427867]
This system is located at:
22181.125
/ -90.25
/ 43984.59375
Galactic coordinates:
R: 49 261,089 / l: 333,239 / b: −0,105
Equatorial coordinates:
Right ascension: 16h 20m 3,926s /
Declination: −50° 16'53,710''
Habitable zone:
Metal-rich body (3 to 79 ls), Earth-like world (1 239 to 1 858 ls), Water world (1 016 to 3 935 ls), Ammonia world (2 571 to 6 996 ls), Terraformable (965 to 1 926 ls)
Estimated value: 1 099 514 cr
Systeemi | Distance | Submitted by | Calculated | |||
---|---|---|---|---|---|---|
Gooroa AH-F c14-6 | 6 466,60 ly |
muterulo 10.8.2022 6.49 |
6 466,60 ly | |||
Gooroa BO-K b28-3 | 6 499,26 ly |
muterulo 10.8.2022 6.49 |
6 499,26 ly | |||
Gooroa NI-Q d6-1 | 6 532,96 ly |
muterulo 10.8.2022 6.49 |
6 532,96 ly | |||
Gooroa TQ-P b25-1 | 6 565,06 ly |
muterulo 10.8.2022 6.49 |
6 565,06 ly | |||
Gooroa QK-R b24-4 | 6 598,01 ly |
muterulo 10.8.2022 6.49 |
6 598,01 ly | |||
Gooroa SJ-K c11-6 | 6 632,54 ly |
muterulo 10.8.2022 6.49 |
6 632,54 ly | |||
Gooroa PD-M c10-8 | 6 663,96 ly |
muterulo 10.8.2022 6.49 |
6 663,96 ly | |||
Gooroa CM-Y b20-2 | 6 696,76 ly |
muterulo 10.8.2022 6.49 |
6 696,76 ly | |||
Gooroa ZF-A b20-2 | 6 718,28 ly |
muterulo 10.8.2022 6.49 |
6 718,28 ly | |||
Gooroa DQ-V d3-44 | 6 743,94 ly |
muterulo 10.8.2022 6.49 |
6 743,94 ly | |||
Gooroa IR-P c8-8 | 6 776,75 ly |
muterulo 10.8.2022 6.49 |
6 776,75 ly | |||
Gooroa HB-J b15-4 | 6 806,54 ly |
muterulo 10.8.2022 6.49 |
6 806,54 ly | |||
Gooroa DV-K b14-0 | 6 839,34 ly |
muterulo 10.8.2022 6.49 |
6 839,34 ly | |||
Gooroa VD-V c5-9 | 6 874,32 ly |
muterulo 10.8.2022 6.49 |
6 874,32 ly | |||
Gooroa RH-Q b11-0 | 6 909,03 ly |
muterulo 10.8.2022 6.49 |
6 909,03 ly | |||
Gooroa JV-T b9-3 | 6 935,55 ly |
muterulo 10.8.2022 6.49 |
6 935,55 ly | |||
Gooroa FM-G b58-5 | 5 809,84 ly |
muterulo 10.8.2022 6.49 |
5 809,84 ly | |||
Gooroa CG-I b57-5 | 5 846,43 ly |
muterulo 10.8.2022 6.49 |
5 846,43 ly | |||
Gooroa YI-W b49-0 | 5 978,53 ly |
muterulo 10.8.2022 6.49 |
5 978,53 ly | |||
Gooroa LP-W a97-0 | 6 008,25 ly |
muterulo 10.8.2022 6.49 |
6 008,25 ly | |||
Gooroa BX-B a95-0 | 6 041,52 ly |
muterulo 10.8.2022 6.49 |
6 041,52 ly | |||
Gooroa UK-F a93-1 | 6 064,80 ly |
muterulo 10.8.2022 6.49 |
6 064,80 ly | |||
Gooroa CS-H d11-69 | 6 088,80 ly |
muterulo 10.8.2022 6.49 |
6 088,80 ly | |||
Gooroa XZ-P a87-0 | 6 114,53 ly |
muterulo 10.8.2022 6.49 |
6 114,53 ly | |||
Gooroa KM-V a84-2 | 6 147,83 ly |
muterulo 10.8.2022 6.49 |
6 147,83 ly | |||
Gooroa XI-C a81-1 | 6 179,77 ly |
muterulo 10.8.2022 6.49 |
6 179,77 ly | |||
Gooroa NB-G a79-2 | 6 193,81 ly |
muterulo 10.8.2022 6.49 |
6 193,81 ly | |||
Gooroa UW-O a74-2 | 6 240,33 ly |
muterulo 10.8.2022 6.49 |
6 240,33 ly | |||
Gooroa GY-V a70-4 | 6 276,71 ly |
muterulo 10.8.2022 6.49 |
6 276,71 ly | |||
Gooroa ZL-Z a68-2 | 6 296,54 ly |
muterulo 10.8.2022 6.49 |
6 296,54 ly | |||
Gooroa SZ-C a67-5 | 6 324,54 ly |
muterulo 10.8.2022 6.49 |
6 324,54 ly | |||
Gooroa DY-B c16-4 | 6 347,80 ly |
muterulo 10.8.2022 6.49 |
6 347,80 ly | |||
Gooroa VO-N a61-1 | 6 378,70 ly |
muterulo 10.8.2022 6.49 |
6 378,70 ly | |||
Gooroa HQ-U a57-6 | 6 412,34 ly |
muterulo 10.8.2022 6.49 |
6 412,34 ly | |||
Gooroa VG-M a48-1 | 6 508,00 ly |
muterulo 10.8.2022 6.49 |
6 508,00 ly | |||
Gooroa GR-F a38-2 | 6 603,85 ly |
muterulo 10.8.2022 6.49 |
6 603,85 ly | |||
Gooroa VY-K a35-0 | 6 634,86 ly |
muterulo 10.8.2022 6.49 |
6 634,86 ly | |||
Gooroa GA-S a31-2 | 6 668,35 ly |
muterulo 10.8.2022 6.49 |
6 668,35 ly | |||
Gooroa NI-E b59-0 | 5 801,02 ly |
muterulo 10.8.2022 6.49 |
5 801,02 ly | |||
Gooroa IH-G b58-0 | 5 818,15 ly |
muterulo 10.8.2022 6.49 |
5 818,15 ly | |||
Gooroa JH-G b58-5 | 5 835,87 ly |
muterulo 10.8.2022 6.49 |
5 835,87 ly | |||
Gooroa FB-I b57-0 | 5 857,79 ly |
muterulo 10.8.2022 6.49 |
5 857,79 ly | |||
Gooroa TZ-O e6-14 | 5 874,56 ly |
muterulo 10.8.2022 6.49 |
5 874,56 ly | |||
Gooroa CV-J b56-4 | 5 890,21 ly |
muterulo 10.8.2022 6.49 |
5 890,21 ly | |||
Gooroa TZ-O e6-0 | 5 911,62 ly |
muterulo 10.8.2022 6.49 |
5 911,62 ly | |||
Gooroa VI-N b54-2 | 5 929,18 ly |
muterulo 10.8.2022 6.49 |
5 929,18 ly | |||
Gooroa KE-E d13-38 | 5 964,82 ly |
muterulo 10.8.2022 6.49 |
5 964,82 ly | |||
Gooroa ML-S b51-1 | 5 985,49 ly |
muterulo 10.8.2022 6.49 |
5 985,49 ly | |||
Gooroa LA-U b50-2 | 6 005,67 ly |
muterulo 10.8.2022 6.49 |
6 005,67 ly | |||
Gooroa HU-V b49-0 | 6 026,92 ly |
muterulo 10.8.2022 6.49 |
6 026,92 ly | |||
Gooroa EO-X b48-2 | 6 047,08 ly |
muterulo 10.8.2022 6.49 |
6 047,08 ly | |||
Gooroa CT-X b48-0 | 6 068,54 ly |
muterulo 10.8.2022 6.49 |
6 068,54 ly | |||
Gooroa WB-B b47-1 | 6 081,89 ly |
muterulo 10.8.2022 6.49 |
6 081,89 ly | |||
Gooroa SV-C b46-3 | 6 097,78 ly |
muterulo 10.8.2022 6.49 |
6 097,78 ly | |||
Gooroa IF-P c22-1 | 6 117,59 ly |
muterulo 10.8.2022 6.49 |
6 117,59 ly | |||
Gooroa EZ-Q c21-11 | 6 136,10 ly |
muterulo 10.8.2022 6.49 |
6 136,10 ly | |||
Gooroa GI-I b43-0 | 6 174,86 ly |
muterulo 10.8.2022 6.49 |
6 174,86 ly | |||
Gooroa ZL-J d10-77 | 6 190,17 ly |
muterulo 10.8.2022 6.49 |
6 190,17 ly | |||
Gooroa ZL-J d10-16 | 6 207,62 ly |
muterulo 10.8.2022 6.49 |
6 207,62 ly | |||
Gooroa VP-N b40-4 | 6 224,60 ly |
muterulo 10.8.2022 6.49 |
6 224,60 ly | |||
Gooroa VR-U c19-13 | 6 236,83 ly |
muterulo 10.8.2022 6.49 |
6 236,83 ly | |||
Gooroa LI-R b38-0 | 6 251,27 ly |
muterulo 10.8.2022 6.49 |
6 251,27 ly | |||
Gooroa IC-T b37-0 | 6 287,80 ly |
muterulo 10.8.2022 6.49 |
6 287,80 ly | |||
Gooroa EW-U b36-0 | 6 307,41 ly |
muterulo 10.8.2022 6.49 |
6 307,41 ly | |||
Gooroa OF-Y c17-19 | 6 326,30 ly |
muterulo 10.8.2022 6.49 |
6 326,30 ly | |||
Gooroa KZ-Z c16-7 | 6 334,60 ly |
muterulo 10.8.2022 6.49 |
6 334,60 ly | |||
Gooroa KZ-Z c16-11 | 6 352,59 ly |
muterulo 10.8.2022 6.49 |
6 352,59 ly | |||
Gooroa RS-B b33-2 | 6 369,08 ly |
muterulo 10.8.2022 6.49 |
6 369,08 ly | |||
Gooroa GT-B c16-13 | 6 386,98 ly |
muterulo 10.8.2022 6.49 |
6 386,98 ly | |||
Gooroa OT-O d7-63 | 6 401,09 ly |
muterulo 10.8.2022 6.49 |
6 401,09 ly | |||
Gooroa CN-D c15-5 | 6 417,33 ly |
muterulo 10.8.2022 6.49 |
6 417,33 ly | |||
Gooroa YG-F c14-10 | 6 429,24 ly |
muterulo 10.8.2022 6.49 |
6 429,24 ly | |||
Gooroa ZG-F c14-9 | 6 448,46 ly |
muterulo 10.8.2022 6.49 |
6 448,46 ly | |||
Gooroa KN-Q d6-49 | 6 461,27 ly |
muterulo 10.8.2022 6.49 |
6 461,27 ly | |||
Gooroa SM-M b27-4 | 6 478,91 ly |
muterulo 10.8.2022 6.49 |
6 478,91 ly | |||
Gooroa OG-O b26-3 | 6 495,90 ly |
muterulo 10.8.2022 6.49 |
6 495,90 ly | |||
Gooroa RU-I c12-2 | 6 513,11 ly |
muterulo 10.8.2022 6.49 |
6 513,11 ly | |||
Gooroa JP-R b24-4 | 6 528,09 ly |
muterulo 10.8.2022 6.49 |
6 528,09 ly | |||
Gooroa NO-K c11-7 | 6 545,49 ly |
muterulo 10.8.2022 6.49 |
6 545,49 ly | |||
Gooroa BD-V b22-3 | 6 562,56 ly |
muterulo 10.8.2022 6.49 |
6 562,56 ly | |||
Gooroa XW-W b21-0 | 6 577,75 ly |
muterulo 10.8.2022 6.49 |
6 577,75 ly | |||
Gooroa PK-A b20-1 | 6 605,46 ly |
muterulo 10.8.2022 6.49 |
6 605,46 ly | |||
Gooroa ME-C b19-1 | 6 640,99 ly |
muterulo 10.8.2022 6.49 |
6 640,99 ly | |||
Gooroa IY-D b18-2 | 6 657,69 ly |
muterulo 10.8.2022 6.49 |
6 657,69 ly | |||
Gooroa FS-F b17-3 | 6 677,01 ly |
muterulo 10.8.2022 6.49 |
6 677,01 ly | |||
Gooroa ZP-R c7-8 | 6 713,58 ly |
muterulo 10.8.2022 6.49 |
6 713,58 ly | |||
Gooroa VO-X d2-68 | 6 726,82 ly |
muterulo 10.8.2022 6.49 |
6 726,82 ly | |||
Gooroa VJ-T c6-19 | 6 742,42 ly |
muterulo 10.8.2022 6.49 |
6 742,42 ly | |||
Gooroa KS-O b12-4 | 6 758,46 ly |
muterulo 10.8.2022 6.49 |
6 758,46 ly | |||
Gooroa IH-Q b11-4 | 6 776,08 ly |
muterulo 10.8.2022 6.49 |
6 776,08 ly | |||
Gooroa NX-W c4-4 | 6 796,31 ly |
muterulo 10.8.2022 6.49 |
6 796,31 ly | |||
Gooroa VT-V b8-5 | 6 828,03 ly |
muterulo 10.8.2022 6.49 |
6 828,03 ly | |||
Gooroa SN-X b7-1 | 6 866,93 ly |
muterulo 10.8.2022 6.49 |
6 866,93 ly | |||
Gooroa GL-A c3-6 | 6 903,52 ly |
muterulo 10.8.2022 6.49 |
6 903,52 ly | |||
Gooroa CF-C c2-1 | 6 920,07 ly |
muterulo 10.8.2022 6.49 |
6 920,07 ly | |||
Gooroa FK-E b4-0 | 6 937,09 ly |
muterulo 10.8.2022 6.49 |
6 937,09 ly | |||
Gooroa KW-C d11 | 6 953,87 ly |
muterulo 10.8.2022 6.49 |
6 953,87 ly | |||
Gooroa KW-C d23 | 6 965,90 ly |
muterulo 10.8.2022 6.49 |
6 965,90 ly | |||
Gooroa US-F c3 | 6 985,74 ly |
muterulo 10.8.2022 6.49 |
6 985,74 ly | |||
Gooroa PL-L b6 | 7 003,57 ly |
muterulo 10.8.2022 6.49 |
7 003,57 ly | |||
Gooroa IS-E b59-5 | 5 794,54 ly |
muterulo 10.8.2022 6.49 |
5 794,54 ly | |||
Gooroa BG-I b57-2 | 5 824,72 ly |
muterulo 10.8.2022 6.49 |
5 824,72 ly | |||
Gooroa YZ-J b56-0 | 5 855,49 ly |
muterulo 10.8.2022 6.49 |
5 855,49 ly | |||
Gooroa QN-N b54-0 | 5 882,58 ly |
muterulo 10.8.2022 6.49 |
5 882,58 ly | |||
Gooroa JB-R b52-2 | 5 927,39 ly |
muterulo 10.8.2022 6.49 |
5 927,39 ly | |||
Gooroa CP-U b50-0 | 5 972,85 ly |
muterulo 10.8.2022 6.49 |
5 972,85 ly | |||
Gooroa GV-N c23-10 | 6 023,00 ly |
muterulo 10.8.2022 6.49 |
6 023,00 ly | |||
Gooroa LF-D b46-5 | 6 052,35 ly |
muterulo 10.8.2022 6.49 |
6 052,35 ly | |||
Gooroa GE-F b45-3 | 6 082,55 ly |
muterulo 10.8.2022 6.49 |
6 082,55 ly | |||
Gooroa WZ-P a87-2 | 6 105,70 ly |
muterulo 10.8.2022 6.49 |
6 105,70 ly | |||
Gooroa MH-V a84-2 | 6 137,00 ly |
muterulo 10.8.2022 6.49 |
6 137,00 ly | |||
Gooroa DA-Z a82-1 | 6 167,76 ly |
muterulo 10.8.2022 6.49 |
6 167,76 ly | |||
Gooroa QW-F a79-5 | 6 195,98 ly |
muterulo 10.8.2022 6.49 |
6 195,98 ly | |||
Gooroa HP-J a77-2 | 6 227,28 ly |
muterulo 10.8.2022 6.49 |
6 227,28 ly | |||
Gooroa WW-O a74-2 | 6 254,58 ly |
muterulo 10.8.2022 6.49 |
6 254,58 ly | |||
Gooroa NS-T a85-0 | 6 128,18 ly |
muterulo 10.8.2022 6.49 |
6 128,18 ly | |||
Gooroa AG-O a88-2 | 6 097,42 ly |
muterulo 10.8.2022 6.49 |
6 097,42 ly | |||
Gooroa CS-H d11-14 | 6 066,22 ly |
muterulo 10.8.2022 6.49 |
6 066,22 ly | |||
Gooroa NQ-B b47-5 | 6 041,64 ly |
muterulo 10.8.2022 6.49 |
6 041,64 ly | |||
Gooroa RW-Z b47-0 | 6 018,99 ly |
muterulo 10.8.2022 6.49 |
6 018,99 ly | |||
Gooroa YI-W b49-1 | 5 994,34 ly |
muterulo 10.8.2022 6.49 |
5 994,34 ly | |||
Gooroa XR-I b1-0 | 6 591,01 ly |
muterulo 10.8.2022 6.49 |
6 591,01 ly | |||
Gooroa BY-G b2-1 | 6 573,66 ly |
muterulo 10.8.2022 6.49 |
6 573,66 ly | |||
Gooroa JK-D b4-2 | 6 548,52 ly |
muterulo 10.8.2022 6.49 |
6 548,52 ly | |||
Gooroa MQ-B b5-2 | 6 519,67 ly |
muterulo 10.8.2022 6.49 |
6 519,67 ly | |||
Gooroa KS-A d1-17 | 6 490,23 ly |
muterulo 10.8.2022 6.49 |
6 490,23 ly | |||
Gooroa JS-A d1-24 | 6 473,67 ly |
muterulo 10.8.2022 6.49 |
6 473,67 ly | |||
Gooroa YD-W b7-1 | 6 448,69 ly |
muterulo 10.8.2022 6.49 |
6 448,69 ly | |||
Gooroa AP-U b8-1 | 6 423,50 ly |
muterulo 10.8.2022 6.49 |
6 423,50 ly | |||
Gooroa FG-R b10-2 | 6 387,01 ly |
muterulo 10.8.2022 6.49 |
6 387,01 ly | |||
Gooroa DL-R b10-2 | 6 377,66 ly |
muterulo 10.8.2022 6.49 |
6 377,66 ly | |||
Gooroa CY-U c5-1 | 6 358,49 ly |
muterulo 10.8.2022 6.49 |
6 358,49 ly | |||
Gooroa GH-O b12-2 | 6 337,03 ly |
muterulo 10.8.2022 6.49 |
6 337,03 ly | |||
Gooroa EJ-T c6-3 | 6 323,96 ly |
muterulo 10.8.2022 6.49 |
6 323,96 ly | |||
Gooroa KD-L b14-1 | 6 309,25 ly |
muterulo 10.8.2022 6.49 |
6 309,25 ly | |||
Gooroa QG-V a29-0 | 6 298,16 ly |
muterulo 10.8.2022 6.49 |
6 298,16 ly | |||
Gooroa YD-Q a32-0 | 6 263,78 ly |
muterulo 10.8.2022 6.49 |
6 263,78 ly | |||
Gooroa TU-D a39-3 | 6 165,28 ly |
muterulo 10.8.2022 6.49 |
6 165,28 ly | |||
Gooroa GI-Y a41-0 | 6 136,72 ly |
muterulo 10.8.2022 6.49 |
6 136,72 ly | |||
Gooroa RH-M c10-0 | 6 118,09 ly |
muterulo 10.8.2022 6.49 |
6 118,09 ly | |||
Gooroa OG-V b22-0 | 6 092,39 ly |
muterulo 10.8.2022 6.49 |
6 092,39 ly | |||
Gooroa XN-R b24-2 | 6 048,80 ly |
muterulo 10.8.2022 6.49 |
6 048,80 ly | |||
Gooroa BU-P b25-1 | 6 032,21 ly |
muterulo 10.8.2022 6.49 |
6 032,21 ly | |||
Gooroa CA-H c13-10 | 6 007,04 ly |
muterulo 10.8.2022 6.49 |
6 007,04 ly | |||
Gooroa BN-Q d6-2 | 5 986,76 ly |
muterulo 10.8.2022 6.49 |
5 986,76 ly | |||
Gooroa ET-O d7-9 | 5 928,86 ly |
muterulo 10.8.2022 6.49 |
5 928,86 ly | |||
Gooroa RN-I b29-2 | 5 937,42 ly |
muterulo 10.8.2022 6.49 |
5 937,42 ly | |||
Gooroa HB-F c14-7 | 5 940,42 ly |
muterulo 10.8.2022 6.49 |
5 940,42 ly | |||
Gooroa CI-Q d6-42 | 5 936,14 ly |
muterulo 10.8.2022 6.49 |
5 936,14 ly | |||
Gooroa OX-J b28-1 | 5 912,78 ly |
muterulo 10.8.2022 6.49 |
5 912,78 ly | |||
Gooroa RD-I b29-2 | 5 895,95 ly |
muterulo 10.8.2022 6.49 |
5 895,95 ly | |||
Gooroa BI-Q d6-37 | 5 890,92 ly |
muterulo 10.8.2022 6.49 |
5 890,92 ly | |||
Gooroa GW-E c14-0 | 5 869,64 ly |
muterulo 10.8.2022 6.49 |
5 869,64 ly | |||
Gooroa EO-O d7-22 | 5 834,61 ly |
muterulo 10.8.2022 6.49 |
5 834,61 ly | |||
Gooroa OO-G b30-0 | 5 819,06 ly |
muterulo 10.8.2022 6.49 |
5 819,06 ly | |||
Gooroa CB-F c14-3 | 5 811,49 ly |
muterulo 10.8.2022 6.49 |
5 811,49 ly | |||
Striechie ZV-A b47-0 | 4 591,99 ly |
muterulo 9.8.2022 7.46 |
4 591,99 ly | |||
Striechie ZT-S b23-0 | 4 105,20 ly |
muterulo 9.8.2022 7.46 |
4 105,20 ly | |||
Striechie ZS-M b54-0 | 4 759,53 ly |
muterulo 9.8.2022 7.46 |
4 759,53 ly | |||
Striechie ZK-N c23-7 | 4 621,72 ly |
muterulo 9.8.2022 7.46 |
4 621,72 ly | |||
Striechie ZJ-C b5-0 | 3 692,46 ly |
muterulo 9.8.2022 7.46 |
3 692,46 ly | |||
Striechie ZG-O b12-0 | 3 859,35 ly |
muterulo 9.8.2022 7.46 |
3 859,35 ly | |||
Striechie ZC-Y a55-2 | 4 192,60 ly |
muterulo 9.8.2022 7.46 |
4 192,60 ly | |||
Striechie ZA-Z a27-4 | 3 904,67 ly |
muterulo 9.8.2022 7.46 |
3 904,67 ly | |||
Striechie ZA-F a107-0 | 4 752,09 ly |
muterulo 9.8.2022 7.46 |
4 752,09 ly | |||
Striechie YS-B b19-1 | 4 016,61 ly |
muterulo 9.8.2022 7.46 |
4 016,61 ly | |||
Striechie YP-I a105-3 | 4 717,01 ly |
muterulo 9.8.2022 7.46 |
4 717,01 ly | |||
Striechie YF-R c7-7 | 3 950,68 ly |
muterulo 9.8.2022 7.46 |
3 950,68 ly | |||
Striechie YE-X a83-2 | 4 488,84 ly |
muterulo 9.8.2022 7.46 |
4 488,84 ly | |||
Striechie YB-B a13-0 | 3 748,98 ly |
muterulo 9.8.2022 7.46 |
3 748,98 ly | |||
Striechie XV-E b31-0 | 4 258,28 ly |
muterulo 9.8.2022 7.46 |
4 258,28 ly | |||
Striechie XT-L a62-4 | 4 261,71 ly |
muterulo 9.8.2022 7.46 |
4 261,71 ly | |||
Striechie XS-K b41-1 | 4 538,38 ly |
muterulo 9.8.2022 7.46 |
4 538,38 ly | |||
Striechie XK-Z c16-9 | 4 392,66 ly |
muterulo 9.8.2022 7.46 |
4 392,66 ly | |||
Striechie XJ-Y b47-1 | 4 663,38 ly |
muterulo 9.8.2022 7.46 |
4 663,38 ly | |||
Striechie XH-Y a96-0 | 4 627,03 ly |
muterulo 9.8.2022 7.46 |
4 627,03 ly | |||
Striechie XB-S d5-7 | 4 123,04 ly |
muterulo 9.8.2022 7.46 |
4 123,04 ly | |||
Striechie XB-N c23-0 | 4 642,78 ly |
muterulo 9.8.2022 7.46 |
4 642,78 ly | |||
Striechie WV-X a110-0 | 4 773,24 ly |
muterulo 9.8.2022 7.46 |
4 773,24 ly | |||
Striechie WS-O a19-2 | 3 818,12 ly |
muterulo 9.8.2022 7.46 |
3 818,12 ly | |||
Striechie WP-C b46-2 | 4 571,53 ly |
muterulo 9.8.2022 7.46 |
4 571,53 ly | |||
Striechie WO-X b48-0 | 4 692,94 ly |
muterulo 9.8.2022 7.46 |
4 692,94 ly | |||
Striechie WO-W b7-1 | 3 800,68 ly |
muterulo 9.8.2022 7.46 |
3 800,68 ly | |||
Striechie WJ-P a5-0 | 3 678,11 ly |
muterulo 9.8.2022 7.46 |
3 678,11 ly | |||
Striechie WJ-C c2-4 | 3 705,62 ly |
muterulo 9.8.2022 7.46 |
3 705,62 ly | |||
Striechie WA-Q b11-0 | 3 839,47 ly |
muterulo 9.8.2022 7.46 |
3 839,47 ly | |||
Striechie VQ-O c22-1 | 4 622,95 ly |
muterulo 9.8.2022 7.46 |
4 622,95 ly | |||
Striechie VQ-I b15-1 | 3 933,54 ly |
muterulo 9.8.2022 7.46 |
3 933,54 ly | |||
Striechie VN-N a61-0 | 4 247,47 ly |
muterulo 9.8.2022 7.46 |
4 247,47 ly | |||
Striechie VM-U a112-0 | 4 794,81 ly |
muterulo 9.8.2022 7.46 |
4 794,81 ly | |||
Striechie VL-O a33-1 | 3 962,89 ly |
muterulo 9.8.2022 7.46 |
3 962,89 ly | |||
Striechie UX-B a40-1 | 4 023,76 ly |
muterulo 9.8.2022 7.46 |
4 023,76 ly | |||
Striechie US-U b22-1 | 4 085,18 ly |
muterulo 9.8.2022 7.46 |
4 085,18 ly | |||
Striechie UP-G b30-0 | 4 235,96 ly |
muterulo 9.8.2022 7.46 |
4 235,96 ly | |||
Striechie UM-M b40-1 | 4 514,87 ly |
muterulo 9.8.2022 7.46 |
4 514,87 ly | |||
Striechie TZ-N b26-1 | 4 176,27 ly |
muterulo 9.8.2022 7.46 |
4 176,27 ly | |||
Striechie TV-T d4-7 | 4 073,11 ly |
muterulo 9.8.2022 7.46 |
4 073,11 ly | |||
Striechie TU-R b10-1 | 3 820,90 ly |
muterulo 9.8.2022 7.46 |
3 820,90 ly | |||
Striechie TP-M a89-1 | 4 543,13 ly |
muterulo 9.8.2022 7.46 |
4 543,13 ly | |||
Striechie TO-P c22-5 | 4 566,42 ly |
muterulo 9.8.2022 7.46 |
4 566,42 ly | |||
Striechie TM-C c29-0 | 4 870,41 ly |
muterulo 9.8.2022 7.46 |
4 870,41 ly | |||
Striechie TE-B c16-7 | 4 381,90 ly |
muterulo 9.8.2022 7.46 |
4 381,90 ly | |||
Striechie TE-B a68-1 | 4 317,26 ly |
muterulo 9.8.2022 7.46 |
4 317,26 ly | |||
Striechie TD-I a119-0 | 4 868,42 ly |
muterulo 9.8.2022 7.46 |
4 868,42 ly | |||
Striechie SU-N b53-1 | 4 783,61 ly |
muterulo 9.8.2022 7.46 |
4 783,61 ly | |||
Striechie SS-A a82-0 | 4 461,57 ly |
muterulo 9.8.2022 7.46 |
4 461,57 ly | |||
Striechie SQ-B a54-0 | 4 171,86 ly |
muterulo 9.8.2022 7.46 |
4 171,86 ly | |||
Striechie SL-U a112-1 | 4 815,69 ly |
muterulo 9.8.2022 7.46 |
4 815,69 ly | |||
Striechie SK-K b14-3 | 3 918,57 ly |
muterulo 9.8.2022 7.46 |
3 918,57 ly | |||
Striechie SD-Z d1-50 | 3 840,77 ly |
muterulo 9.8.2022 7.46 |
3 840,77 ly | |||
Striechie SD-E c1-2 | 3 693,47 ly |
muterulo 9.8.2022 7.46 |
3 693,47 ly | |||
Striechie SA-L d9-5 | 4 431,85 ly |
muterulo 9.8.2022 7.46 |
4 431,85 ly | |||
Striechie SA-L d9-35 | 4 455,64 ly |
muterulo 9.8.2022 7.46 |
4 455,64 ly | |||
Striechie RZ-D d13-16 | 4 788,37 ly |
muterulo 9.8.2022 7.46 |
4 788,37 ly | |||
Striechie RX-F b3-0 | 3 665,87 ly |
muterulo 9.8.2022 7.46 |
3 665,87 ly | |||
Striechie RT-U c5-0 | 3 891,89 ly |
muterulo 9.8.2022 7.46 |
3 891,89 ly | |||
Striechie RR-S b37-1 | 4 392,92 ly |
muterulo 9.8.2022 7.46 |
4 392,92 ly | |||
Striechie RP-E a11-3 | 3 733,94 ly |
muterulo 9.8.2022 7.46 |
3 733,94 ly | |||
Striechie RM-W b21-0 | 4 066,52 ly |
muterulo 9.8.2022 7.46 |
4 066,52 ly | |||
Striechie RM-S b37-0 | 4 406,37 ly |
muterulo 9.8.2022 7.46 |
4 406,37 ly | |||
Striechie RG-O b39-0 | 4 493,50 ly |
muterulo 9.8.2022 7.46 |
4 493,50 ly | |||
Striechie RG-N a116-0 | 4 835,05 ly |
muterulo 9.8.2022 7.46 |
4 835,05 ly | |||
Striechie RF-P c22-4 | 4 646,38 ly |
muterulo 9.8.2022 7.46 |
4 646,38 ly | |||
Striechie RD-M a103-3 | 4 700,30 ly |
muterulo 9.8.2022 7.46 |
4 700,30 ly | |||
Striechie RA-D b59-0 | 4 889,96 ly |
muterulo 9.8.2022 7.46 |
4 889,96 ly | |||
Striechie QV-O a74-2 | 4 388,15 ly |
muterulo 9.8.2022 7.46 |
4 388,15 ly | |||
Striechie QT-P b25-1 | 4 157,71 ly |
muterulo 9.8.2022 7.46 |
4 157,71 ly | |||
Striechie QT-P a46-2 | 4 090,47 ly |
muterulo 9.8.2022 7.46 |
4 090,47 ly | |||
Striechie QP-V d3-7 | 3 988,61 ly |
muterulo 9.8.2022 7.46 |
3 988,61 ly | |||
Striechie QO-T b9-0 | 3 798,82 ly |
muterulo 9.8.2022 7.46 |
3 798,82 ly | |||
Striechie PZ-O e6-3 | 4 786,70 ly |
muterulo 9.8.2022 7.46 |
4 786,70 ly | |||
Striechie PZ-D b59-0 | 4 907,67 ly |
muterulo 9.8.2022 7.46 |
4 907,67 ly | |||
Striechie PU-M d8-32 | 4 356,46 ly |
muterulo 9.8.2022 7.46 |
4 356,46 ly | |||
Striechie PS-S c20-2 | 4 474,18 ly |
muterulo 9.8.2022 7.46 |
4 474,18 ly | |||
Striechie PS-E a66-0 | 4 299,46 ly |
muterulo 9.8.2022 7.46 |
4 299,46 ly | |||
Striechie PO-T b9-1 | 3 811,77 ly |
muterulo 9.8.2022 7.46 |
3 811,77 ly | |||
Striechie PL-F b17-0 | 3 977,45 ly |
muterulo 9.8.2022 7.46 |
3 977,45 ly | |||
Striechie PJ-G a10-0 | 3 724,03 ly |
muterulo 9.8.2022 7.46 |
3 724,03 ly | |||
Striechie PI-Z d1-52 | 3 782,27 ly |
muterulo 9.8.2022 7.46 |
3 782,27 ly | |||
Striechie PI-K a104-2 | 4 722,86 ly |
muterulo 9.8.2022 7.46 |
4 722,86 ly | |||
Striechie PG-S a17-2 | 3 801,31 ly |
muterulo 9.8.2022 7.46 |
3 801,31 ly | |||
Striechie PF-A c3-2 | 3 717,21 ly |
muterulo 9.8.2022 7.46 |
3 717,21 ly | |||
Striechie OX-J a118-2 | 4 860,46 ly |
muterulo 9.8.2022 7.46 |
4 860,46 ly | |||
Striechie OR-H b2-0 | 3 644,88 ly |
muterulo 9.8.2022 7.46 |
3 644,88 ly | |||
Striechie OM-P a101-2 | 4 680,58 ly |
muterulo 9.8.2022 7.46 |
4 680,58 ly | |||
Striechie OL-U b36-0 | 4 373,66 ly |
muterulo 9.8.2022 7.46 |
4 373,66 ly | |||
Striechie OC-E b59-0 | 4 859,90 ly |
muterulo 9.8.2022 7.46 |
4 859,90 ly | |||
Striechie OC-B b47-1 | 4 671,19 ly |
muterulo 9.8.2022 7.46 |
4 671,19 ly | |||
Striechie OB-R a59-1 | 4 228,39 ly |
muterulo 9.8.2022 7.46 |
4 228,39 ly | |||
Striechie NZ-R a31-0 | 3 942,58 ly |
muterulo 9.8.2022 7.46 |
3 942,58 ly | |||
Striechie NU-T b50-0 | 4 676,35 ly |
muterulo 9.8.2022 7.46 |
4 676,35 ly | |||
Striechie NP-I c12-0 | 4 122,61 ly |
muterulo 9.8.2022 7.46 |
4 122,61 ly | |||
Striechie NN-R b24-1 | 4 146,42 ly |
muterulo 9.8.2022 7.46 |
4 146,42 ly | |||
Striechie NM-L a117-2 | 4 850,89 ly |
muterulo 9.8.2022 7.46 |
4 850,89 ly | |||
Striechie NI-G b44-3 | 4 545,80 ly |
muterulo 9.8.2022 7.46 |
4 545,80 ly | |||
Striechie MZ-E c28-1 | 4 812,53 ly |
muterulo 9.8.2022 7.46 |
4 812,53 ly | |||
Striechie MU-Z a109-0 | 4 765,81 ly |
muterulo 9.8.2022 7.46 |
4 765,81 ly | |||
Striechie MS-E a66-1 | 4 297,71 ly |
muterulo 9.8.2022 7.46 |
4 297,71 ly | |||
Striechie MI-V b8-0 | 3 774,53 ly |
muterulo 9.8.2022 7.46 |
3 774,53 ly | |||
Striechie LX-H b43-2 | 4 516,63 ly |
muterulo 9.8.2022 7.46 |
4 516,63 ly | |||
Striechie LW-N c9-3 | 4 036,82 ly |
muterulo 9.8.2022 7.46 |
4 036,82 ly | |||
Striechie LW-F b58-1 | 4 838,04 ly |
muterulo 9.8.2022 7.46 |
4 838,04 ly | |||
Striechie LW-B b5-2 | 3 748,65 ly |
muterulo 9.8.2022 7.46 |
3 748,65 ly | |||
Striechie LR-C d28 | 3 664,06 ly |
muterulo 9.8.2022 7.46 |
3 664,06 ly | |||
Striechie LK-G c27-6 | 4 822,89 ly |
muterulo 9.8.2022 7.46 |
4 822,89 ly | |||
Striechie LJ-S a72-1 | 4 369,29 ly |
muterulo 9.8.2022 7.46 |
4 369,29 ly | |||
Striechie LI-R b51-0 | 4 734,32 ly |
muterulo 9.8.2022 7.46 |
4 734,32 ly | |||
Striechie LC-G a24-1 | 3 866,93 ly |
muterulo 9.8.2022 7.46 |
3 866,93 ly | |||
Striechie KZ-X a110-2 | 4 800,02 ly |
muterulo 9.8.2022 7.46 |
4 800,02 ly | |||
Striechie KU-X b34-2 | 4 333,03 ly |
muterulo 9.8.2022 7.46 |
4 333,03 ly | |||
Striechie KR-U a2-2 | 3 657,04 ly |
muterulo 9.8.2022 7.46 |
3 657,04 ly | |||
Striechie KO-V b49-1 | 4 652,54 ly |
muterulo 9.8.2022 7.46 |
4 652,54 ly | |||
Striechie KI-D a108-0 | 4 750,73 ly |
muterulo 9.8.2022 7.46 |
4 750,73 ly | |||
Striechie KH-Y c3-1 | 3 823,31 ly |
muterulo 9.8.2022 7.46 |
3 823,31 ly | |||
Striechie KE-F a52-1 | 4 153,40 ly |
muterulo 9.8.2022 7.46 |
4 153,40 ly | |||
Striechie KA-A b20-0 | 4 026,81 ly |
muterulo 9.8.2022 7.46 |
4 026,81 ly | |||
Striechie JR-J b42-1 | 4 503,63 ly |
muterulo 9.8.2022 7.46 |
4 503,63 ly | |||
Striechie JO-B a109-1 | 4 757,36 ly |
muterulo 9.8.2022 7.46 |
4 757,36 ly | |||
Striechie JM-N b26-1 | 4 179,07 ly |
muterulo 9.8.2022 7.46 |
4 179,07 ly | |||
Striechie JL-F b44-1 | 4 594,17 ly |
muterulo 9.8.2022 7.46 |
4 594,17 ly | |||
Striechie JI-Q d6-9 | 4 188,67 ly |
muterulo 9.8.2022 7.46 |
4 188,67 ly | |||
Striechie JH-T a44-0 | 4 075,12 ly |
muterulo 9.8.2022 7.46 |
4 075,12 ly | |||
Striechie JD-I c26-2 | 4 734,44 ly |
muterulo 9.8.2022 7.46 |
4 734,44 ly | |||
Striechie JC-X b7-0 | 3 759,13 ly |
muterulo 9.8.2022 7.46 |
3 759,13 ly | |||
Striechie IZ-I b15-0 | 3 923,56 ly |
muterulo 9.8.2022 7.46 |
3 923,56 ly | |||
Striechie IX-R a86-2 | 4 517,66 ly |
muterulo 9.8.2022 7.46 |
4 517,66 ly | |||
Striechie IS-P b11-3 | 3 869,50 ly |
muterulo 9.8.2022 7.46 |
3 869,50 ly | |||
Striechie IQ-D b4-1 | 3 722,09 ly |
muterulo 9.8.2022 7.46 |
3 722,09 ly | |||
Striechie IN-H b57-1 | 4 886,84 ly |
muterulo 9.8.2022 7.46 |
4 886,84 ly | |||
Striechie IK-C d14-28 | 4 860,80 ly |
muterulo 9.8.2022 7.46 |
4 860,80 ly | |||
Striechie II-Q d6-33 | 4 213,80 ly |
muterulo 9.8.2022 7.46 |
4 213,80 ly | |||
Striechie IH-S b51-0 | 4 756,35 ly |
muterulo 9.8.2022 7.46 |
4 756,35 ly | |||
Striechie IA-T a99-1 | 4 656,42 ly |
muterulo 9.8.2022 7.46 |
4 656,42 ly | |||
Striechie HW-N a102-0 | 4 707,48 ly |
muterulo 9.8.2022 7.46 |
4 707,48 ly | |||
Striechie HU-H c26-2 | 4 756,67 ly |
muterulo 9.8.2022 7.46 |
4 756,67 ly | |||
Striechie HT-Z a109-0 | 4 785,15 ly |
muterulo 9.8.2022 7.46 |
4 785,15 ly | |||
Striechie HP-U a57-1 | 4 213,47 ly |
muterulo 9.8.2022 7.46 |
4 213,47 ly | |||
Striechie HL-W a1-1 | 3 640,47 ly |
muterulo 9.8.2022 7.46 |
3 640,47 ly | |||
Striechie HK-C d14-18 | 4 825,97 ly |
muterulo 9.8.2022 7.46 |
4 825,97 ly | |||
Striechie HB-A c3-5 | 3 778,51 ly |
muterulo 9.8.2022 7.46 |
3 778,51 ly | |||
Striechie GW-Y b6-0 | 3 740,16 ly |
muterulo 9.8.2022 7.46 |
3 740,16 ly | |||
Striechie GC-X c4-6 | 3 848,14 ly |
muterulo 9.8.2022 7.46 |
3 848,14 ly | |||
Striechie GB-V b22-1 | 4 098,02 ly |
muterulo 9.8.2022 7.46 |
4 098,02 ly | |||
Striechie FZ-D d13-3 | 4 785,74 ly |
muterulo 9.8.2022 7.46 |
4 785,74 ly | |||
Striechie FX-V a70-2 | 4 348,87 ly |
muterulo 9.8.2022 7.46 |
4 348,87 ly | |||
Striechie FT-K b14-0 | 3 902,06 ly |
muterulo 9.8.2022 7.46 |
3 902,06 ly | |||
Striechie FR-G a106-1 | 4 722,69 ly |
muterulo 9.8.2022 7.46 |
4 722,69 ly | |||
Striechie FJ-D b18-0 | 4 003,16 ly |
muterulo 9.8.2022 7.46 |
4 003,16 ly | |||
Striechie FG-P b25-0 | 4 150,93 ly |
muterulo 9.8.2022 7.46 |
4 150,93 ly | |||
Striechie FF-J b56-1 | 4 806,38 ly |
muterulo 9.8.2022 7.46 |
4 806,38 ly | |||
Striechie FC-F a107-0 | 4 734,42 ly |
muterulo 9.8.2022 7.46 |
4 734,42 ly | |||
Striechie FA-P a115-1 | 4 835,36 ly |
muterulo 9.8.2022 7.46 |
4 835,36 ly | |||
Striechie EO-T b36-0 | 4 443,69 ly |
muterulo 9.8.2022 7.46 |
4 443,69 ly | |||
Striechie EO-J c25-2 | 4 715,42 ly |
muterulo 9.8.2022 7.46 |
4 715,42 ly | |||
Striechie EN-I b56-0 | 4 888,26 ly |
muterulo 9.8.2022 7.46 |
4 838,26 ly | |||
Striechie EN-B a109-2 | 4 775,42 ly |
muterulo 9.8.2022 7.46 |
4 775,42 ly | |||
Striechie EK-R c7-4 | 3 950,09 ly |
muterulo 9.8.2022 7.46 |
3 950,09 ly | |||
Striechie EK-F b3-2 | 3 696,19 ly |
muterulo 9.8.2022 7.46 |
3 696,19 ly | |||
Striechie EH-K c25-5 | 4 704,49 ly |
muterulo 9.8.2022 7.46 |
4 704,49 ly | |||
Striechie EG-I a64-2 | 4 275,71 ly |
muterulo 9.8.2022 7.46 |
4 275,71 ly | |||
Striechie DW-K d9-12 | 4 464,11 ly |
muterulo 9.8.2022 7.46 |
4 464,11 ly | |||
Striechie DI-B b33-1 | 4 304,97 ly |
muterulo 9.8.2022 7.46 |
4 304,97 ly | |||
Plua Chruia ZX-O b33-1 | 4 320,56 ly |
muterulo 9.8.2022 7.46 |
4 320,56 ly | |||
Plua Chruia ZX-H c23-8 | 4 610,63 ly |
muterulo 9.8.2022 7.46 |
4 610,63 ly | |||
Plua Chruia ZU-P b47-0 | 4 634,35 ly |
muterulo 9.8.2022 7.46 |
4 634,35 ly | |||
Plua Chruia ZU-C b27-0 | 4 187,36 ly |
muterulo 9.8.2022 7.46 |
4 187,36 ly | |||
Plua Chruia ZT-P b19-1 | 4 018,71 ly |
muterulo 9.8.2022 7.46 |
4 018,71 ly | |||
Plua Chruia ZQ-Z b41-0 | 4 503,50 ly |
muterulo 9.8.2022 7.46 |
4 503,50 ly | |||
Plua Chruia ZQ-B b14-0 | 3 927,30 ly |
muterulo 9.8.2022 7.46 |
3 927,30 ly | |||
Plua Chruia ZP-N c20-5 | 4 492,16 ly |
muterulo 9.8.2022 7.46 |
4 492,16 ly | |||
Plua Chruia ZO-I c9-12 | 4 024,23 ly |
muterulo 9.8.2022 7.46 |
4 024,23 ly | |||
Plua Chruia ZL-U c16-6 | 4 349,91 ly |
muterulo 9.8.2022 7.46 |
4 349,91 ly | |||
Plua Chruia ZG-O b47-2 | 4 626,92 ly |
muterulo 9.8.2022 7.46 |
4 626,92 ly | |||
Plua Chruia ZE-W b29-2 | 4 252,37 ly |
muterulo 9.8.2022 7.46 |
4 252,37 ly | |||
Plua Chruia ZD-T d3-41 | 3 953,08 ly |
muterulo 9.8.2022 7.46 |
3 953,08 ly | |||
Plua Chruia ZD-T d3-14 | 3 981,42 ly |
muterulo 9.8.2022 7.46 |
3 981,42 ly | |||
Plua Chruia ZB-M b21-2 | 4 084,76 ly |
muterulo 9.8.2022 7.46 |
4 084,76 ly | |||
Plua Chruia ZA-O d6-6 | 4 195,03 ly |
muterulo 9.8.2022 7.46 |
4 195,03 ly | |||
Plua Chruia YZ-Z b54-0 | 4 774,56 ly |
muterulo 9.8.2022 7.46 |
4 774,56 ly | |||
Plua Chruia YY-K b8-4 | 3 812,97 ly |
muterulo 9.8.2022 7.46 |
3 812,97 ly | |||
Plua Chruia YW-W c1-3 | 3 698,15 ly |
muterulo 9.8.2022 7.46 |
3 698,15 ly | |||
Plua Chruia YT-J b50-2 | 4 691,18 ly |
muterulo 9.8.2022 7.46 |
4 691,18 ly | |||
Plua Chruia YT-I c9-0 | 3 995,61 ly |
muterulo 9.8.2022 7.46 |
3 995,61 ly | |||
Plua Chruia YS-U d2-55 | 3 907,35 ly |
muterulo 9.8.2022 7.46 |
3 907,35 ly | |||
Plua Chruia YR-Y b0 | 3 659,62 ly |
muterulo 9.8.2022 7.46 |
3 659,62 ly | |||
Plua Chruia YQ-F b11-1 | 3 845,29 ly |
muterulo 9.8.2022 7.46 |
3 845,29 ly | |||
Plua Chruia YP-G d10-9 | 4 530,02 ly |
muterulo 9.8.2022 7.46 |
4 530,02 ly | |||
Plua Chruia YP-G d10-32 | 4 537,25 ly |
muterulo 9.8.2022 7.46 |
4 537,25 ly | |||
Plua Chruia YN-M b48-2 | 4 648,95 ly |
muterulo 9.8.2022 7.46 |
4 648,95 ly | |||
Plua Chruia YK-P b19-1 | 4 041,34 ly |
muterulo 9.8.2022 7.46 |
4 041,34 ly | |||
Plua Chruia YJ-R d4-1 | 4 034,09 ly |
muterulo 9.8.2022 7.46 |
4 034,09 ly | |||
Plua Chruia YI-Y b28-1 | 4 225,66 ly |
muterulo 9.8.2022 7.46 |
4 225,66 ly | |||
Plua Chruia YH-R b32-0 | 4 327,58 ly |
muterulo 9.8.2022 7.46 |
4 327,58 ly | |||
Plua Chruia YH-O b6-1 | 3 796,77 ly |
muterulo 9.8.2022 7.46 |
3 796,77 ly | |||
Plua Chruia YH-O b6-0 | 3 783,16 ly |
muterulo 9.8.2022 7.46 |
3 783,16 ly | |||
Plua Chruia YH-B b27-0 | 4 198,77 ly |
muterulo 9.8.2022 7.46 |
4 198,77 ly | |||
Plua Chruia YF-Y b14-3 | 3 948,05 ly |
muterulo 9.8.2022 7.46 |
3 948,05 ly | |||
Plua Chruia YE-H b24-0 | 4 179,68 ly |
muterulo 9.8.2022 7.46 |
4 179,68 ly | |||
Plua Chruia YC-Z c27-4 | 4 797,86 ly |
muterulo 9.8.2022 7.46 |
4 797,86 ly | |||
Plua Chruia YC-Z c27-3 | 4 821,53 ly |
muterulo 9.8.2022 7.46 |
4 821,53 ly | |||
Plua Chruia YB-E b12-1 | 3 870,49 ly |
muterulo 9.8.2022 7.46 |
3 870,49 ly | |||
Plua Chruia YA-X b56-1 | 4 824,62 ly |
muterulo 9.8.2022 7.46 |
4 824,62 ly | |||
Plua Chruia XY-O b33-1 | 4 322,91 ly |
muterulo 9.8.2022 7.46 |
4 322,91 ly | |||
Plua Chruia XW-L b21-1 | 4 074,76 ly |
muterulo 9.8.2022 7.46 |
4 074,76 ly | |||
Plua Chruia XW-A c27-4 | 4 753,35 ly |
muterulo 9.8.2022 7.46 |
4 753,35 ly | |||
Plua Chruia XV-E d11-0 | 4 601,53 ly |
muterulo 9.8.2022 7.46 |
4 601,53 ly | |||
Plua Chruia XT-Z c13-9 | 4 237,73 ly |
muterulo 9.8.2022 7.46 |
4 237,73 ly | |||
Plua Chruia XT-Z c13-11 | 4 212,36 ly |
muterulo 9.8.2022 7.46 |
4 212,36 ly | |||
Plua Chruia XT-K b8-1 | 3 809,49 ly |
muterulo 9.8.2022 7.46 |
3 809,49 ly | |||
Plua Chruia XS-U d2-63 | 3 925,55 ly |
muterulo 9.8.2022 7.46 |
3 925,55 ly | |||
Plua Chruia XS-N b21-0 | 4 077,09 ly |
muterulo 9.8.2022 7.46 |
4 077,09 ly | |||
Plua Chruia XR-N c6-10 | 3 924,55 ly |
muterulo 9.8.2022 7.46 |
3 924,55 ly | |||
Plua Chruia XP-Y b55-1 | 4 796,94 ly |
muterulo 9.8.2022 7.46 |
4 796,94 ly | |||
Plua Chruia XN-M b7-0 | 3 798,81 ly |
muterulo 9.8.2022 7.46 |
3 798,81 ly | |||
Plua Chruia XL-W b56-0 | 4 835,55 ly |
muterulo 9.8.2022 7.46 |
4 835,55 ly | |||
Plua Chruia XK-N c20-5 | 4 485,19 ly |
muterulo 9.8.2022 7.46 |
4 485,19 ly | |||
Plua Chruia XK-N c20-3 | 4 510,95 ly |
muterulo 9.8.2022 7.46 |
4 510,95 ly | |||
Plua Chruia XK-D b13-0 | 3 889,61 ly |
muterulo 9.8.2022 7.46 |
3 889,61 ly | |||
Plua Chruia XI-V b2-1 | 3 674,67 ly |
muterulo 9.8.2022 7.46 |
3 674,67 ly | |||
Plua Chruia XF-N c20-3 | 4 480,99 ly |
muterulo 9.8.2022 7.46 |
4 480,99 ly | |||
Plua Chruia XF-N c20-10 | 4 510,19 ly |
muterulo 9.8.2022 7.46 |
4 510,19 ly | |||
Plua Chruia XF-F d11-10 | 4 601,71 ly |
muterulo 9.8.2022 7.46 |
4 601,71 ly | |||
Plua Chruia XD-E b39-0 | 4 450,40 ly |
muterulo 9.8.2022 7.46 |
4 450,40 ly | |||
Plua Chruia XB-Z b41-2 | 4 503,22 ly |
muterulo 9.8.2022 7.46 |
4 503,22 ly | |||
Plua Chruia WX-Y b28-0 | 4 237,46 ly |
muterulo 9.8.2022 7.46 |
4 237,46 ly | |||
Plua Chruia WX-U d2-31 | 3 928,03 ly |
muterulo 9.8.2022 7.46 |
3 928,03 ly | |||
Plua Chruia WX-L b49-0 | 4 661,01 ly |
muterulo 9.8.2022 7.46 |
4 661,01 ly | |||
Plua Chruia WV-N b20-1 | 4 061,23 ly |
muterulo 9.8.2022 7.46 |
4 061,23 ly | |||
Plua Chruia WV-L c21-7 | 4 542,94 ly |
muterulo 9.8.2022 7.46 |
4 542,94 ly | |||
Plua Chruia WU-L b35-1 | 4 363,25 ly |
muterulo 9.8.2022 7.46 |
4 363,25 ly | |||
Plua Chruia WS-U d2-57 | 3 887,85 ly |
muterulo 9.8.2022 7.46 |
3 887,85 ly | |||
Plua Chruia WS-U d2-4 | 3 860,70 ly |
muterulo 9.8.2022 7.46 |
3 860,70 ly | |||
Plua Chruia WR-T b58-1 | 4 867,46 ly |
muterulo 9.8.2022 7.46 |
4 867,46 ly | |||
Plua Chruia WR-Q b32-0 | 4 298,62 ly |
muterulo 9.8.2022 7.46 |
4 298,62 ly | |||
Plua Chruia WN-D b12-0 | 3 894,11 ly |
muterulo 9.8.2022 7.46 |
3 894,11 ly | |||
Plua Chruia WK-N c20-6 | 4 509,62 ly |
muterulo 9.8.2022 7.46 |
4 509,62 ly | |||
Plua Chruia WI-V b2-2 | 3 680,69 ly |
muterulo 9.8.2022 7.46 |
3 680,69 ly | |||
Plua Chruia WI-K c8-2 | 3 986,76 ly |
muterulo 9.8.2022 7.46 |
3 986,76 ly | |||
Plua Chruia WF-W c15-5 | 4 286,90 ly |
muterulo 9.8.2022 7.46 |
4 286,90 ly | |||
Plua Chruia WF-N c20-2 | 4 495,14 ly |
muterulo 9.8.2022 7.46 |
4 495,14 ly | |||
Plua Chruia WC-E b40-1 | 4 462,74 ly |
muterulo 9.8.2022 7.46 |
4 462,74 ly | |||
Plua Chruia VW-N c6-12 | 3 919,21 ly |
muterulo 9.8.2022 7.46 |
3 919,21 ly | |||
Plua Chruia VS-U b3-1 | 3 716,13 ly |
muterulo 9.8.2022 7.46 |
3 716,13 ly | |||
Plua Chruia VR-Q b32-1 | 4 309,50 ly |
muterulo 9.8.2022 7.46 |
4 309,50 ly | |||
Plua Chruia VR-J c22-10 | 4 570,49 ly |
muterulo 9.8.2022 7.46 |
4 570,49 ly | |||
Plua Chruia VQ-Y b42-0 | 4 541,05 ly |
muterulo 9.8.2022 7.46 |
4 541,05 ly | |||
Plua Chruia VO-I d9-31 | 4 483,04 ly |
muterulo 9.8.2022 7.46 |
4 483,04 ly | |||
Plua Chruia VN-M b48-1 | 4 640,07 ly |
muterulo 9.8.2022 7.46 |
4 640,07 ly | |||
Plua Chruia VK-H b10-1 | 3 828,90 ly |
muterulo 9.8.2022 7.46 |
3 828,90 ly | |||
Plua Chruia VK-C b40-2 | 4 473,95 ly |
muterulo 9.8.2022 7.46 |
4 473,95 ly | |||
Plua Chruia VJ-I d9-37 | 4 423,75 ly |
muterulo 9.8.2022 7.46 |
4 423,75 ly | |||
Plua Chruia VJ-A b55-2 | 4 777,87 ly |
muterulo 9.8.2022 7.46 |
4 777,87 ly | |||
Plua Chruia VH-O b47-0 | 4 625,82 ly |
muterulo 9.8.2022 7.46 |
4 625,82 ly | |||
Plua Chruia VE-P c19-4 | 4 458,13 ly |
muterulo 9.8.2022 7.46 |
4 458,13 ly | |||
Plua Chruia VE-I b10-1 | 3 849,10 ly |
muterulo 9.8.2022 7.46 |
3 849,10 ly | |||
Plua Chruia VE-B b28-0 | 4 237,55 ly |
muterulo 9.8.2022 7.46 |
4 237,55 ly | |||
Plua Chruia VD-T d3-29 | 3 944,97 ly |
muterulo 9.8.2022 7.46 |
3 944,97 ly | |||
Plua Chruia VC-B b27-1 | 4 184,82 ly |
muterulo 9.8.2022 7.46 |
4 184,82 ly | |||
Plua Chruia VB-Q b5-2 | 3 772,80 ly |
muterulo 9.8.2022 7.46 |
3 772,80 ly | |||
Plua Chruia VB-D b26-2 | 4 184,03 ly |
muterulo 9.8.2022 7.46 |
4 184,03 ly | |||
Plua Chruia VB-D b26-0 | 4 170,67 ly |
muterulo 9.8.2022 7.46 |
4 170,67 ly | |||
Plua Chruia VB-B c27-2 | 4 786,51 ly |
muterulo 9.8.2022 7.46 |
4 786,51 ly | |||
Plua Chruia UZ-G d10-18 | 4 481,42 ly |
muterulo 9.8.2022 7.46 |
4 481,42 ly | |||
Plua Chruia UY-B b54-2 | 4 752,96 ly |
muterulo 9.8.2022 7.46 |
4 752,96 ly | |||
Plua Chruia UX-U d2-20 | 3 911,76 ly |
muterulo 9.8.2022 7.46 |
3 911,76 ly | |||
Plua Chruia UQ-V b16-2 | 3 978,41 ly |
muterulo 9.8.2022 7.46 |
3 978,41 ly | |||
Plua Chruia UP-R b45-0 | 4 585,19 ly |
muterulo 9.8.2022 7.46 |
4 585,19 ly | |||
Plua Chruia UP-C b40-3 | 4 463,87 ly |
muterulo 9.8.2022 7.46 |
4 463,87 ly | |||
Plua Chruia UO-M b35-1 | 4 387,75 ly |
muterulo 9.8.2022 7.46 |
4 387,75 ly | |||
Plua Chruia UN-M b7-3 | 3 787,30 ly |
muterulo 9.8.2022 7.46 |
3 787,30 ly | |||
Plua Chruia UN-D b12-3 | 3 891,09 ly |
muterulo 9.8.2022 7.46 |
3 891,09 ly | |||
Plua Chruia UM-P b20-0 | 4 060,11 ly |
muterulo 9.8.2022 7.46 |
4 060,11 ly | |||
Plua Chruia UK-H b10-0 | 3 840,83 ly |
muterulo 9.8.2022 7.46 |
3 840,83 ly | |||
Plua Chruia UH-T b4-0 | 3 705,32 ly |
muterulo 9.8.2022 7.46 |
3 705,32 ly | |||
Plua Chruia UF-S b32-1 | 4 315,45 ly |
muterulo 9.8.2022 7.46 |
4 315,45 ly | |||
Plua Chruia UF-A c8 | 3 653,91 ly |
muterulo 9.8.2022 7.46 |
3 653,91 ly | |||
Plua Chruia UF-A c4 | 3 639,13 ly |
muterulo 9.8.2022 7.46 |
3 639,13 ly | |||
Plua Chruia UE-R b18-2 | 4 024,01 ly |
muterulo 9.8.2022 7.46 |
4 024,01 ly | |||
Plua Chruia UE-F b12-0 | 3 866,77 ly |
muterulo 9.8.2022 7.46 |
3 866,77 ly | |||
Plua Chruia UD-R c18-1 | 4 440,33 ly |
muterulo 9.8.2022 7.46 |
4 440,33 ly | |||
Plua Chruia UC-X b1-1 | 3 661,77 ly |
muterulo 9.8.2022 7.46 |
3 661,77 ly | |||
Plua Chruia UA-K b36-1 | 4 380,06 ly |
muterulo 9.8.2022 7.46 |
4 380,06 ly | |||
Plua Chruia TZ-X c14-6 | 4 238,83 ly |
muterulo 9.8.2022 7.46 |
4 238,83 ly | |||
Plua Chruia TZ-E b25-2 | 4 136,81 ly |
muterulo 9.8.2022 7.46 |
4 136,81 ly | |||
Plua Chruia TY-B b54-0 | 4 763,56 ly |
muterulo 9.8.2022 7.46 |
4 763,56 ly | |||
Plua Chruia TS-Q b32-2 | 4 307,78 ly |
muterulo 9.8.2022 7.46 |
4 307,78 ly | |||
Plua Chruia TR-X b42-0 | 4 515,65 ly |
muterulo 9.8.2022 7.46 |
4 515,65 ly | |||
Plua Chruia TQ-E b25-2 | 4 152,06 ly |
muterulo 9.8.2022 7.46 |
4 152,06 ly | |||
Plua Chruia TP-P b19-1 | 4 035,66 ly |
muterulo 9.8.2022 7.46 |
4 035,66 ly | |||
Plua Chruia TO-I d9-0 | 4 408,48 ly |
muterulo 9.8.2022 7.46 |
4 408,48 ly | |||
Plua Chruia TL-R b4-2 | 3 747,42 ly |
muterulo 9.8.2022 7.46 |
3 747,42 ly | |||
Plua Chruia TJ-D b40-0 | 4 469,72 ly |
muterulo 9.8.2022 7.46 |
4 469,72 ly | |||
Plua Chruia TH-T b17-0 | 3 974,74 ly |
muterulo 9.8.2022 7.46 |
3 974,74 ly | |||
Plua Chruia TH-O b6-2 | 3 774,60 ly |
muterulo 9.8.2022 7.46 |
3 774,60 ly | |||
Plua Chruia TH-F b11-2 | 3 881,54 ly |
muterulo 9.8.2022 7.46 |
3 881,54 ly | |||
Plua Chruia TG-Z b2 | 3 667,65 ly |
muterulo 9.8.2022 7.46 |
3 667,65 ly | |||
Plua Chruia TE-P c19-6 | 4 436,61 ly |
muterulo 9.8.2022 7.46 |
4 436,61 ly | |||
Plua Chruia TB-Q b46-1 | 4 598,96 ly |
muterulo 9.8.2022 7.46 |
4 598,96 ly | |||
Plua Chruia SY-C b27-0 | 4 215,14 ly |
muterulo 9.8.2022 7.46 |
4 215,14 ly | |||
Plua Chruia SX-U d2-24 | 3 859,24 ly |
muterulo 9.8.2022 7.46 |
3 859,24 ly | |||
Plua Chruia SX-U d2-11 | 3 917,05 ly |
muterulo 9.8.2022 7.46 |
3 917,05 ly | |||
Plua Chruia SW-E c11-11 | 4 107,19 ly |
muterulo 9.8.2022 7.46 |
4 107,19 ly | |||
Plua Chruia SV-P c5-0 | 3 892,40 ly |
muterulo 9.8.2022 7.46 |
3 892,40 ly | |||
Plua Chruia SV-M b21-0 | 4 077,61 ly |
muterulo 9.8.2022 7.46 |
4 077,61 ly | |||
Plua Chruia SV-C c26-6 | 4 722,98 ly |
muterulo 9.8.2022 7.46 |
4 722,98 ly | |||
Plua Chruia ST-B b13-3 | 3 901,82 ly |
muterulo 9.8.2022 7.46 |
3 901,82 ly | |||
Plua Chruia SR-W d1-33 | 3 861,79 ly |
muterulo 9.8.2022 7.46 |
3 861,79 ly | |||
Plua Chruia SP-N c20-5 | 4 487,35 ly |
muterulo 9.8.2022 7.46 |
4 487,35 ly | |||
Plua Chruia SL-S b31-1 | 4 292,99 ly |
muterulo 9.8.2022 7.46 |
4 292,99 ly | |||
Plua Chruia SL-L c21-3 | 4 537,72 ly |
muterulo 9.8.2022 7.46 |
4 537,72 ly | |||
Plua Chruia SK-R c4-14 | 3 847,53 ly |
muterulo 9.8.2022 7.46 |
3 847,53 ly | |||
Plua Chruia SK-R c4-11 | 3 861,99 ly |
muterulo 9.8.2022 7.46 |
3 861,99 ly | |||
Plua Chruia SI-K d8-25 | 4 357,86 ly |
muterulo 9.8.2022 7.46 |
4 357,86 ly | |||
Plua Chruia SF-M c21-1 | 4 546,62 ly |
muterulo 9.8.2022 7.46 |
4 546,62 ly | |||
Plua Chruia SD-K d8-0 | 4 324,72 ly |
muterulo 9.8.2022 7.46 |
4 324,72 ly | |||
Plua Chruia SC-D c12-11 | 4 120,31 ly |
muterulo 9.8.2022 7.46 |
4 120,31 ly | |||
Plua Chruia RY-S b17-1 | 4 014,44 ly |
muterulo 9.8.2022 7.46 |
4 014,44 ly | |||
Plua Chruia RW-Y b2 | 3 641,01 ly |
muterulo 9.8.2022 7.46 |
3 641,01 ly | |||
Plua Chruia RT-P c19-1 | 4 478,75 ly |
muterulo 9.8.2022 7.46 |
4 478,75 ly | |||
Plua Chruia RT-N b34-0 | 4 340,17 ly |
muterulo 9.8.2022 7.46 |
4 340,17 ly | |||
Plua Chruia RS-K b22-3 | 4 156,27 ly |
muterulo 9.8.2022 7.46 |
4 156,27 ly | |||
Plua Chruia RP-C b40-0 | 4 457,69 ly |
muterulo 9.8.2022 7.46 |
4 457,69 ly | |||
Plua Chruia RK-P b19-0 | 4 035,48 ly |
muterulo 9.8.2022 7.46 |
4 035,43 ly | |||
Plua Chruia RK-E c25-2 | 4 695,67 ly |
muterulo 9.8.2022 7.46 |
4 695,67 ly | |||
Plua Chruia RK-E c25-10 | 4 675,53 ly |
muterulo 9.8.2022 7.46 |
4 675,53 ly | |||
Plua Chruia RJ-N b34-2 | 4 337,26 ly |
muterulo 9.8.2022 7.46 |
4 337,26 ly | |||
Plua Chruia RJ-I d9-21 | 4 406,69 ly |
muterulo 9.8.2022 7.46 |
4 406,69 ly | |||
Plua Chruia RJ-E b39-1 | 4 442,65 ly |
muterulo 9.8.2022 7.46 |
4 442,65 ly | |||
Plua Chruia RJ-A b55-0 | 4 774,63 ly |
muterulo 9.8.2022 7.46 |
4 774,63 ly | |||
Plua Chruia RH-O b6-1 | 3 762,71 ly |
muterulo 9.8.2022 7.46 |
3 762,71 ly | |||
Plua Chruia RF-C b40-2 | 4 468,42 ly |
muterulo 9.8.2022 7.46 |
4 468,42 ly | |||
Plua Chruia RE-J b9-2 | 3 822,55 ly |
muterulo 9.8.2022 7.46 |
3 822,55 ly | |||
Plua Chruia RC-G b38-0 | 4 421,35 ly |
muterulo 9.8.2022 7.46 |
4 421,35 ly | |||
Plua Chruia RB-V b3-0 | 3 683,19 ly |
muterulo 9.8.2022 7.46 |
3 683,19 ly | |||
Plua Chruia QY-Q c18-6 | 4 413,16 ly |
muterulo 9.8.2022 7.46 |
4 413,16 ly | |||
Plua Chruia QY-Q c18-1 | 4 398,52 ly |
muterulo 9.8.2022 7.46 |
4 398,52 ly | |||
Plua Chruia QX-L d7-28 | 4 275,31 ly |
muterulo 9.8.2022 7.46 |
4 275,31 ly | |||
Plua Chruia QT-Q c18-12 | 4 392,43 ly |
muterulo 9.8.2022 7.46 |
4 392,43 ly | |||
Plua Chruia QP-A b42-1 | 4 508,53 ly |
muterulo 9.8.2022 7.46 |
4 508,53 ly | |||
Plua Chruia QM-D c12-6 | 4 150,58 ly |
muterulo 9.8.2022 7.46 |
4 150,58 ly |