Stuemeae FG-Y d7561 (Explorer's Anchorage) [#259804475954059]

星系资讯

拥护:

独立

政府:

民主

经济:

Extraction

安保等级:

Medium

 

人口:

750,000

控制派系:

Deep Space Surveys
(投资)

坐标

This system is located at: 28.6875 / -19.78125 / 25899.6875

银河系坐标 R: 25,899.711 / l: 359.937 / b: -0.044
赤道坐标 赤经 17h 45m 38.375s / 赤纬 -29° 0'47.313''


货物储备等级 储量未经开发

可居住区域:
Metal-rich body (2 to 27 ls), Earth-like world (428 to 642 ls), Water world (351 to 1,359 ls), Ammonia world (888 to 2,415 ls), Terraformable (333 to 665 ls)

预计价值: 710,433 cr

交通报告

This system was visited for the first time on EDSM by Andargor on 2015年1月15日 上午4:31:00.

它被银星系地图团队命名为:Explorer's Anchorage

5080 ships passed through Stuemeae FG-Y d7561 space, including 99 ships in the last 7 days.

25 ships passed through Stuemeae FG-Y d7561 space in the last 24 hours.

Breakdown:
Anaconda - 6
Asp Explorer - 5
Diamondback Explorer - 2
Krait MkII - 1
Krait Phantom - 8
Sidewinder - 3

3 ships were destroyed in this system in the last 24 hours.
次要派系
Deep Space Surveys (Investment) 58.542 %
Dawnlight Core Mining Operations (None) 13.786 %
The Order of Imagination (None) 10.789 %
Mishka Corp. (None) 8.991 %
Transorbital Dynamics (None) 7.892 %

This station acts as an Exploration and Scientific research hub at the very core the Milky Way, just a few light years from Sagittarius A*.

Warning: Stuemeae FG-Y d7561 is a binary star system. Commanders visiting the system need to be aware that its possible to exit hyperspace close to one of the stars.

Planning and Preparation: Elite Wiki (Explorer's Anchorage)

The station superstructure was constructed in January 3305 at the Omega Mining Asteroid base, with the Distant Worlds 2 starfleet making up the bulk of the workforce during the Community Goal.

enter image description here

Galnet: Link

On February 21st 3305, the Explorer's Anchorage was deployed, with 5 stages of construction set to complete the station between Feb. 21st and Mar. 21st 3305.

Stage 1 - Deployed Feb. 21st 3305

  • Mobile docking hub launched from Omega Sector VE-Q b5-15, arrives at destination site in Stuemeae FG-Y d7561.
  • Services added; Commodities, Mission Board, Outfitting, Passenger Lounge, Refuel, Blackmarket.

enter image description here

Stage 2 - Deployed Feb. 28th 3305

  • Thruster assembly removed, beginning of superstructure construction (solar panels, habitat ring support struts).
  • Services added; Contacts, Repair, Restock, Universal Cartographics.

enter image description here

Stage 3 - Deployed Mar. 7th 3305

  • Habitation Hub Superstructure construction begins.

enter image description here

Stage 4 - Deployed Mar. 14th 3305

  • Habitation Hub Superstructure construction continues.

enter image description here

Stage 5 - Deployed Mar. 21st 3305

  • Habitation Hub Superstructure construction complete. Starport becomes fully operational, providing all major services except a shipyard.

enter image description here

Astrophotography by Erimus Kamzel